At Sawad Apparels, we follow the standard Quality Assurance process at vendor factories to ensure the garments produced are of highest standard free from any defects. Lot of people and machines are involved in producing a garment. There is an obvious chance of making few faulty garments in a batch due to faulty machine or human intervention. The defective pieces can be corrected by repairing or changing defective parts. But repair work costs money and time. These both increase inefficiency of the company. And if one defect passed through initial process without detecting and correction and process goes on then at the later stages repair cost will be much more than detecting it in initial stage.
Production process starts after receiving of fabrics and end after dispatching of packed garments. Generally, export house put quality check points at the end of each process to ensure that only quality pieces move to the next process. Department wise quality check points have been explained in the following.
Fabric Store | 100% fabric inspection |
Trim & accessories | Trims inspection |
Cutting Room | Marker checking
Cut parts checking or audit Bundle inspection |
Printing and Embroidery | 100 % inspection of printing panels
100% inspection of embroidery |
Sewing Department | Inline check point (at critical operation)
Roaming checking (Random checking) End of Line checking (100%) Audit of checked pieces |
Finishing Department | Initial finishing inspection (after wash)
Final finishing inspection (After Pressing) Internal shipment audit |
- Fabric Store:
In the fabric store fabric is being checked before issuing it to cutting department. In general, not all the fabric is checked. Usually 10% of fabrics are checked for good fabric suppliers. For power loom fabric and printed fabric 100% checking is done. Fabrics are checked in flat table, flat table with light box or on fabric checking machine. 4-point system for fabric inspection is used to measure the quality level of the incoming fabric.
- Trims & Accessory:
Trims quality is also very important for having a quality garment. Trims inspection is done randomly against the given standards, like color matching. But for trims and accessories quantity checking is essential.
- Cutting Room:
It is said that cutting is the heart of production. If cutting is done well, then chances of occurring defects in the following processes comes down. In cutting room, check points are – i) marker checking, ii) cut part audit and iii) bundle checking.
- Printing Checking:
Printing is not a compulsory process. If printing is done in fabric form, then printing is being checked in fabric store. For knits garment, maximum printing is done in cut panels. So, before issuing cuttings to sewing department, each panel is being checked properly. Defects that are found here is print placement, color matching, misprint or print overlapping or shade variation.
- Embroidery checking:
Like printing; embroidery also is not a compulsory process. If there is embroidery work in the garment panels then 100% inspection is done before issuing to sewing.
- Sewing Department: Checkpoints in the sewing departments are as following.
- Inline inspection: In assembly line generally checkpoints are kept for the critical operations. In these checkpoints, 100% checking is done for partially stitched garments and defect free pieces are forwarded to the next process. This type of checking is used for high value garment.
- Roaming inspection: In this case checkers roam around the line and randomly check pieces at each operation.
- Traffic light inspection system: In this system, each operator is given a card for measuring their quality performance. Quality checker goes to the operator and do random check for few pieces and according to the inspection result, checker marked red or green on the card following rating criteria.
- End of line inspection or table checking: A checker checks completely stitched garment at the end of the line. 100% checking is done here,
- Audit of the checked pieces: It is very essential checkpoint to assure that only 100% inspected garment are sent to finishing from sewing department. All defective pieces are repaired before sending to finishing.
- Finishing Department:
Check points in finishing department consists
- Initial finishing inspection: Checking done prior to pressing of the garment at finishing room is known as initial finishing inspection.
- Final finishing Inspection: After pressing, garments are again checked and passed for tagging and packing.
Internal final audit: After garments are packed up to certain quantity, quality control team perform audit of packed garments. This process is carried out to ensure that defect free garments are handed over to buyer.